Next
View
Prev

Campus Bern University of Applied Sciences, Bern

One technical college, three user units, two construction sites. How can that come together? With a clear statement: each type of user will have his own building, connected by a split where the central infrastructure will be. However, the individual buildings are also internaly connected to each due to the rotation of each building. In this way, the units can be read independently, even from the outside and, at the same time, the BFH remains a whole, with all the associated advantages. The main access to each building be via a large curved staircases that will be connected in the split by an interior street. It will be the main artery of the campus.

Read more Read less

STUDIOPEZ and wulf architekten

Landscape: Chaves Biedermann | Structure: WMM and holzprojekt | Engineering and Costs : Drees & Sommer Schweiz | Fire and Security: Rapp | Gastronomie: AG HPMISTELI & PARTNER | Special Acoustics: Müller-BBM | Fassade: Dr. Lüchinger+Meyer | Lighting: Reflexion | Theaterplaning: Planungsbüro Theater- und Lichttechnik

Read more Read less